|
|
|
|||||||||||||||||||
|
We replaced probably 95% of the wiring on Valentina.
We then installed a new electrical panel, breakers and moved and replaced
bilge pumps and a sump pump that was over the electrical wiring.
On the electrical panel, we installed a LINK 20 to
monitor the batteries, replaced our ProSine charger/inverter with a
Xantrex, a bilge pump monitor,
and controllers for the wind generator and solar panels.
|
||||||||||||||||||||
|
||||||||||||||||||||
|
|
||||||||||||||||||||